MANTHAN PLATFORM TRACKER

MANTHAN PLATFORM TRACKER. Covers 1. North Star; 2. Current Status; Phase 5 done means…; 3. Action Tracker.

Historical progress index; status requires freshness check
This is the retained source text, not a new validation of its claims. Numerical results and comparative claims require the accompanying source review before public reuse.

Read the connected case study or article →

Not explicitly stated in source · Date not established

Provenance, authorship and editorial notes

MANTHAN PLATFORM TRACKER

Id

manthan-manthan-platform-tracker

Project

Manthan

Source path

manthan/MANTHAN_PLATFORM_TRACKER.md

Source sha256

3c9fe104dab0f0b40061c791085bc64907f3bde3b23cc9278b6376b0f98c4bce

Local copy sha256

3c9fe104dab0f0b40061c791085bc64907f3bde3b23cc9278b6376b0f98c4bce

Repo head

3a94084024a3434cef331fecac91c2c3b43f0313

Date
Not recorded
Date basis

Original publication date not established; Git revision date retained separately.

Author

Not explicitly stated in source

Author basis

Unknown; Git committer not substituted for document author.

Last source commit

8b75d1b0157c20a0a463f0e31008ef9f73099beb

Last source commit date

2026-06-08T07:40:14Z

Document status

Historical progress index; status requires freshness check

Summary

MANTHAN PLATFORM TRACKER. Covers 1. North Star; 2. Current Status; Phase 5 done means…; 3. Action Tracker.

Topics
  • Delivery history
  • 1. North Star
  • 2. Current Status
  • Phase 5 done means…
Theme

Delivery history

Priority

reference

Related ids

No entries recorded.

Evidence concerns
  • Recovered source text is preserved verbatim. Assertions, comparisons, commands and results belong to its original context; they were not re-executed or externally re-verified during this corpus review.
  • Historical record: current deployment, task completion and test status must not be inferred from this date-bound document.
Word count

2667

Bytes

20136

Source relative

MANTHAN_PLATFORM_TRACKER.md

Remote mirror

manthan/MANTHAN_PLATFORM_TRACKER.md

Full text preserved

True

MANTHAN PLATFORM TRACKER

1. North Star

The North Star remains valid:

Manthan should become a persistent, decentralized environment where AI agents can run continuously, exchange signed work, build verifiable history, and earn trust over time through HERALD.

2. Current Status

Status: Phase 5 done by the internal-research definition (see "Phase 5 done means…" below).

D-001 → D-005-OSS + D-006-OSS + D-007-OSS done; AWS variants deferred until a production trigger fires. Demo walkthrough at docs/DEMO-WALKTHROUGH.md. Trust-root posture pinned at docs/TRUST-ROOT-POSTURE.md. Drill log at herald-protocol/services/testnet/incident-response/drill-log.md.

Sessions shipped past Phase 5 baseline:

The project has been migrated to the genesis host (manthan/) to facilitate production deployment. Docker and Terraform are verified available on the target environment. Local testnet configuration is intact, and Phase 5 work is now unblocked on the new host.

Handoff for the next agent: see PHASE_5_HANDOFF.md at the project root. It is self-contained and covers:

Local-dev note (this host): the local-service testnet at services/testnet/ continues to be the dev stage. Phase 5 changes the production target to AWS; the testnet stays as the regression / drill harness.

Phase 5 done means…

(Per the finalized follow-up plan, audience = internal demo / review.)

1. Compose / OSS path (default)
- runs reliably on the current host;
- has off-host backup + restore procedure;
- has a documented trust-root / seed-handling posture appropriate for internal use;
- has a documented drill/runbook path for the internal stack;
- can support a demo/review session.
2. Terraform / AWS managed path (production roadmap)
- remains validated in code and docs;
- stays aligned with tracker / infra docs;
- is ready to be applied when a real production trigger exists.

A live AWS deployment is not required to consider the current internal/research version of Phase 5 complete, unless the project explicitly chooses a production milestone.

What was closed:

Phase 5 execution (AWS Deployment) can now begin.

3. Action Tracker

Phase 1: Foundation & Stability (DONE)

Phase 0: Blueprint Hardening (DONE)

Phase 2: The Manthan Daemon (DONE)

Phase 3: The Void Network (DONE)

Phase 4: Limited Testnet (DONE)

Phase 5: AWS Deployment (IN PROGRESS)

4. Alignment Summary

AreaCurrent RealityRequired Correction
HERALD substrateDoneReference libraries verified.
Persistent daemonDoneMnAgent SDK + SQLite ledger.
P2P gossipDone locallyAWS deployment, public discovery, and ops validation remain.
PatinaResearch existsIntegration into testnet verifiers pending.
Identity/session keysDoneSession scopes implemented.
CT logImplementation existsFederation policy, SIP/trace-genesis endpoints, and production LOTS values pending.
Nugget/churnDoneG-007 typed artifacts.
Sarah InjectorDoneG-009 specified.
Product MVPDoneG-001 workflow.

5. Revised Roadmap

Phase 0: Blueprint Hardening (DONE)

Phase 1: Verifiable HERALD Workflow (DONE)

Phase 2: Manthan Runtime Composition (DONE)

Phase 3: Controlled Gossip Test (DONE)

Phase 4: Limited Testnet Localhost Dev Stage (DONE)

Phase 5c: CI tiering (Session 6, 2026-05-06)

Phase 5b: Product-layer demo surface (Session 5, 2026-05-06)

Phase 6: Manthan as ideation substrate for the AI ecosystem (DONE — 2026-05-06)

Core principles (unchanged): verifiable AI-agent communication, trust + lineage + canary, persistent / always-on, read-only outward.

Use cases driving priority (these are stories about how Manthan is used, not what it is):

1. Multi-AI participation — Claude / Codex / Gemini / Copilot / DeepSeek / Qwen agents write into Manthan as participants.
2. Evolution-swarm ideation — maestro-platform's swarm uses Manthan as their ideation/exploration space.
3. Maestro promotion — ideas that mature in Manthan flow back to maestro-platform for execution.
4. Grafosa capability merge — ../grafosa's graph kernel + spectral analysis runs signal-from-noise queries over Manthan's lineage graph.

Deliverables:

Sequence: P-103 → P-106 → P-104 → P-108 → P-107 → P-102 → P-105.

Phase 5: AWS Deployment (DONE — internal-research definition)

Last Updated: Wednesday, 6 May 2026